Net metering guide

Net metering, step by step

Use your solar power first, send the extra to the grid, and pay only for the difference. Here is the whole process in plain words.

Your bill

You pay only for the difference

Every month the utility reads one two-way meter. Power you send to the grid is taken off the power you bought.

Billed units = Imported − Exported + Credit

Credit that is still left at the end of the year (1 July – 30 June) is paid to you by the utility at the government's bulk rate.

Example 1

A normal month

Imported from the grid400 kWh
Exported to the grid150 kWh
Billed units250 kWh

You pay for 250 kWh instead of 400.

Example 2

A sunny month

Imported from the grid200 kWh
Exported to the grid260 kWh
Billed units0 kWh

No energy charge. 60 kWh is saved as credit for next month (demand charge and VAT still apply).

Who can apply

Most grid customers can join

  • Any customer class

    Low, medium, high and extra-high voltage customers, single-phase included.

  • New connections too

    Apply with the tracking ID of your new-connection application.

  • Up to 100% of your load

    Inverter output up to your full sanctioned load. Panels can be up to about 1.3 times the inverter size.

  • On your own premises

    Roof, open space, boundary wall or floating — but inside your property.

The process

Six steps from application to credit

The utility decides each step. We prepare the design, install the system and help with the paperwork.

  1. 1

    Apply online

    We help

    Apply on the government net-metering portal with your customer account number.

  2. 2

    Permission letter

    The utility checks the application and replies within 10 working days.

  3. 3

    Install the system

    We do this

    Install within 8 months, using panels and inverters on SREDA's approved list.

  4. 4

    Inspection

    We help

    Apply for system evaluation from your dashboard. The utility inspects the installation.

  5. 5

    Sign the contract

    We help

    Within 15 working days of a passed inspection, you and the utility sign the agreement.

  6. 6

    Two-way meter

    Your meter is reprogrammed or replaced with a two-way net meter. Credits start.

Keep these ready

What you need to apply

  • Electricity customer account number (on your bill)
  • Mobile number and email address
  • Scanned signature
  • Tracking ID, if it is a new connection
Open the net-metering portal

Two ways to pay

Own it, or let an investor own it

CAPEX — you own it

You pay for the system (own money or bank loan) and keep all the savings. This is what we install.

OPEX — investor owns it

A third party installs and runs the system and sells you the power below the grid price, under a three-party contract.

Questions

Net metering FAQ

Is all my solar power sent to the grid?
No. Your building uses the solar power first. Only the extra goes to the grid.
Do I need a new meter?
Not always. If the utility can reprogram your meter to two-way, it is kept. Otherwise a new net meter is installed. Its location does not change.
How much roof do I need?
Roughly 7–10 m² (75–110 sq ft) per kWp, depending on the design. Our estimate shows the roof area for your size.
Which equipment is allowed?
Only solar panels and inverters on SREDA's approved list. We choose from that list.
Who approves my application?
Your electricity distribution utility. We help you through the process but cannot promise approval.

Checked on 1 October 2026Source: Net-metering portal FAQ and Net Metering Guideline 2025, Power Division.

The utility makes the final decision on every application. We help you understand the process; we do not promise approval.